Skip to content

Creative System

  • Increase learning velocity on new ICPs.
  • Refresh fatigued channels with structured variation.
  • Standardize asset production across teams.
  • ICP brief, positioning, and offer.
  • Asset backlog with hypotheses and metrics.
  • Tracking plan and creative repository.
StageTactics
BriefDefine concept, audience, claim, CTA
ProduceTemplate scripts, motion, layouts
TestShip 3–5 variants per concept
LearnAttribute outcomes; keep/kill decisions
  • Primary KPI: qualified conversions; secondary: CTR, CPC.
  • Cap frequency; rotate winners; document fatigue thresholds.
  • Risk: channel overfitting → diversify concepts.
  • Risk: brand drift → brand guardrails and review.
  • UGC-heavy products vs. B2B demo-led.
  • High-velocity vs. regulated categories.